Length: 11.93 m. Width: 4.32 m
Draft: 2.2 m. Gross tonnage: 16.34 ums
Builder: Hirvark. Construction: Polyester
Year of construction: 1993
Engine: MAN D2866LXE40
Power: 145 kW. Hours: 10,000
Propeller: 4-blade. Fuel tanks: 2
Fuel capacity: 2 x 970 liters
Hydraulic tanks: 1 x 250 liters
Livewell: 2 under the gangway
Capacity: 7,000 liters
Winch: 1 monobloc with 3 reels.
Gantry: 1 stainless steel with 2 independent brake motor reels.
Locker hauler: 1 on starboard side, possibility of adding 1 on the port side.
Berths: 4 forward
Bridge: 1 central with small covered deck
Hold: 1 laminated aft
Electronic equipment:
3 VHF
2 Furuno GPS
1 Max computer
1 Turbo 2000 computer
1 Furuno depth sounder
1 Furuno radar
1 Class B Ais
1 Furuno pilot
1 220V inverter
Dual controls on bridge
1 microwave
1 shore charger
Equipment:
2x4 dredges with poles
2 trawls
180 cuttlefish traps
1 new Dawson engine (pre-assembled)
1 new starter
Costs to be incurred in 2024/2025:
RCM gasket replacement
Propeller overhaul
Exchanger cleaning
1 Tank Diesel
Zinc
Fairing
Hold hatch opening
1 fan
Can be used to make the hull from the rear or the sides
Stability OK
Length: 11.93 m. Width: 4.32 m
Draft: 2.2 m. Gross tonnage: 16.34 ums
Builder: Hirvark. Construction: Polyester
Year of construction: 1993
Engine: MAN D2866LXE40
Power: 145 kW. Hours: 10,000
Propeller: 4-blade. Fuel tanks: 2
Fuel capacity: 2 x 970 liters
Hydraulic tanks: 1 x 250 liters
Livewell: 2 under the gangway
Capacity: 7,000 liters
Winch: 1 monobloc with 3 reels.
Gantry: 1 stainless steel with 2 independent brake motor reels.
Locker hauler: 1 on starboard side, possibility of adding 1 on the port side.
Berths: 4 forward
Bridge: 1 central with small covered deck
Hold: 1 laminated aft
Electronic equipment:
3 VHF
2 Furuno GPS
1 Max computer
1 Turbo 2000 computer
1 Furuno depth sounder
1 Furuno radar
1 Class B Ais
1 Furuno pilot
1 220V inverter
Dual controls on bridge
1 microwave
1 shore charger
Equipment:
2x4 dredges with poles
2 trawls
180 cuttlefish traps
1 new Dawson engine (pre-assembled)
1 new starter
Costs to be incurred in 2024/2025:
RCM gasket replacement
Propeller overhaul
Exchanger cleaning
1 Tank Diesel
Zinc
Fairing
Hold hatch opening
1 fan
Can be used to make the hull from the rear or the sides
Stability OK